Field Note · Routes & seasons

    South India motorcycle tour riding: why 140 km takes four hours

    An itinerary for the Malabar coast gives 140 km four hours, and a rider who does 300 km before lunch at home reads that as padding. It is not. South India motorcycle tour riding runs on a slower clock than anything in the Himalaya, and distance is the least of the reasons. The clock is set by a half-built highway, more two-wheelers than you have ever shared a road with, buses that own the hairpins, and air that will not take your sweat.

    View over the handlebars of an adventure motorcycle in slow coastal traffic, with a bus ahead, scooters filtering on both sides and concrete barriers dividing a half-built highway.
    Illustration: Illustration: the coastal clock in one frame. A bus ahead, scooters on both sides, a half-built carriageway behind the barriers, and a wet road under a humid sky.
    Col. Shekhar Attri, SM (Retd.)@adv_pathfinderLast checked 16 October 20269 min read

    Why south India motorcycle tour riding runs on a slower clock

    Start with the government's own number. The Bharatmala booklet the Press Information Bureau published in November 2022 puts the average speed on the national highway network at 32 km/h. That is the baseline for the best roads in the country, before you add a coast.

    Then the law. Kerala's Motor Vehicles Department still shows its 2014 order: a motorcycle may do 60 km/h on a national highway, 50 on a state highway, 45 on a ghat road and 50 inside a municipality. The 2023 revision, per Onmanorama, cut the two-wheeler ceiling from 70 to 60, and the department's page has not caught up. So: 60 on the best road in Kerala, 45 on the ghats.

    140 km at a legal 60 with nothing in the way is two hours twenty. The coast road runs through its towns, not round them, wherever the bypass is not yet built. Four hours is the honest number, and the day you beat it, you were speeding.

    NH 66 is a highway being built around you

    The Ministry of Road Transport's list of national highways puts NH 66 at 1,640.66 km from Panvel to near Kanyakumari, 677.77 km of it in Kerala and 294.14 km in Karnataka. Kerala is widening 643 km of its share to six lanes in 17 reaches, Kerala Kaumudi reported in July 2024.

    The finish date has moved four times in twelve months, so here are all four. October 2025: the state's public works minister said 450 km were done and the road would open by January 2026. December 2025: the Union minister told the Lok Sabha March, after the highway had collapsed at three places in six months. April 2026: Kerala Kaumudi reported it would not finish this year, with collapses at Kooriyad and Mylakkadu and an alignment change behind the delay. October 2026: Onmanorama reported NHAI had pushed the Kannur reach to April 2028.

    On a bike that means diversions onto half-finished service roads, and two-way traffic on one carriageway. Ride every orange barrel as a lane change nobody told you about. Karnataka is further along: Talapady to Mulki is four lanes, Daijiworld reported in September 2026, quoting NHAI's Mangaluru office.

    The traffic is scooters, and they live here

    Kerala had 182 lakh registered vehicles in March 2025, 118.67 lakh of them two-wheelers, by the State Planning Board's Economic Review 2025. About 65 in 100, my arithmetic. Tamil Nadu goes further: 3.59 crore vehicles in May 2024, 84.09 per cent two-wheelers, by its Transport Department's own policy note.

    Add the roads. The ministry's Basic Road Statistics 2019-20 gives Kerala 6,650 km of road per 1,000 sq km against 1,935 for India, nearly three and a half times the national density. A scooter joining from the left is not an event here. It is the road.

    Then the buses. Tamil Nadu runs 30,881 stage carriage buses, 20,260 of them state-owned, by the same policy note. Ride as if the bus behind you is late and the one ahead will stop without warning.

    The ghats: hairpins, trucks and a court order

    Thamarassery Churam on NH 766 is the climb everyone names: nine hairpins over 14 km from Adivaram to the Lakkidi viewpoint at 800 m, in Kerala Tourism's description. Since June 2026 the Kozhikode collector has barred heavy multi-axle vehicles from the ghat between 6 am and 8 pm, Onmanorama reported, which means fewer trucks on the bends in daylight.

    Dhimbam ghat on NH 948 is the one with paperwork. The Madras High Court's judgment of 6 April 2022 records 9 km of ghat with 27 steep hairpins and sets the rules: two-wheelers between 6 am and 9 pm only, trucks capped at 20 km/h, anything with 12 wheels or more banned. The Kalhatty road from Masinagudi to Ooty, 36 hairpins by Tamil Nadu Tourism's count, is under a 2026 High Court order allowing 200 tourist vehicles a day, and forest officials told Onmanorama in September the quota is usually gone by 11 am.

    Bandipur is the gate that catches riders. NH 766 through the tiger reserve has had a night ban since 2009, upheld by the Supreme Court in 2019. PTI gave the hours as 9 pm to 6 am in April 2025; Onmanorama gave 8.30 pm to 6 am in January 2026. Be through by 8.30. A bus climbing a hairpin uses the whole road to make the turn. Give it the road, then take yours.

    Humidity: why you are finished by eleven

    The IMD's 1991 to 2020 normals, filed with the World Meteorological Organization, give Mangalore airport a mean relative humidity of 65 per cent in January, 70 in April, 89 in July and 82 in October. October, when the riding window opens, averages a 31.2 degree C maximum at 82 per cent humidity. The pairing is the problem, not the temperature.

    The IMD's own heat wave FAQ says why: high relative humidity slows the evaporation of sweat and cuts the body's cooling efficiency. NIOSH, the US occupational health institute, puts a number on it in its 2016 heat standard: once the heat index passes 35 degrees C largely because of humidity, evaporative heat loss is, in its words, virtually nonexistent. You keep sweating. You keep losing water. You do not get cooler.

    So the desert tricks fail. A soaked evaporative vest works in dry air because the air pulls the water out; at 82 per cent it has little to evaporate into. Mesh vents air that is already wet. Drink on a schedule, not on thirst, and put the long legs in the first three hours. Rain is the other half: Mangalore airport averages 28 rainy days in July and still 10 in October. The north-east monsoon's normal onset over coastal Tamil Nadu is 20 October; in 2026 the IMD declared it under way on 15 October.

    The crash numbers, read properly

    The ministry's Road Accidents in India 2023 counts 4,80,583 crashes and 1,72,890 deaths, two-wheeler riders 44.8 per cent of the dead. Tamil Nadu had the most crashes of any state for five straight years to 2023, 67,213 that year, and the second most deaths, 18,347. Kerala was third in crashes, 48,091, and seventeenth in deaths, 4,080; 2,233 of those dead were on two-wheelers, 55 per cent by my arithmetic.

    The 2024 edition, out in June 2026, changes none of it: two-wheelers rose to 46.2 per cent of deaths and both states held their ranks. Kerala's crashes are many and mostly survivable, which is what dense, slow traffic produces. Tamil Nadu's are many and lethal. The road that lets you open the throttle is the road that kills.

    How we run the South

    Our eleven-day circuit is sealed road the whole way, Thamarassery's nine hairpins included. Days run 60 to 380 km and three to eight hours in the saddle; the longest is Hampi to South Goa, about 380 km on NH 66, seven to eight hours with stops, with a support vehicle and mechanic behind eight to twelve riders. Ask whoever you ride with how they set the hours on the itinerary. If the answer is distance divided by 60, nobody has ridden the road lately.

    Before a riding day on the coast or the ghats

    • Plan on the government's 32 km/h highway average, not the limit. A motorcycle in Kerala is capped at 60 on a national highway and 45 on a ghat.
    • Expect NH 66 diversions through 2026 and beyond. The Kannur reach is due in April 2028.
    • Through Bandipur before 8.30 pm. Dhimbam is open to two-wheelers 6 am to 9 pm. Kalhatty's 200-vehicle quota is gone by 11 am.
    • Drink on a schedule. At 31 degrees and 82 per cent humidity, sweat is not cooling you. Give a climbing bus the whole hairpin.

    Questions riders ask

    How fast can you ride a motorcycle in Kerala?

    60 km/h on a national highway, 50 on a state highway, 45 on a ghat road and 50 inside a municipality, under the 2014 order the Motor Vehicles Department still publishes. The 2023 revision cut the two-wheeler ceiling from 70 to 60 and did not raise the rest, so treat 60 as the top everywhere and 45 on the climbs.

    Is NH 66 finished in Kerala?

    No. As of October 2026 the Kasaragod and Kannur reaches were at 91 and 87 per cent, Azhiyur to Vengalam at 68, and NHAI has put April 2028 on the Kannur reach. Expect diversions and single-carriageway sections through the 2026-27 season.

    Can you ride through Bandipur at night?

    No. NH 766 and NH 67 through the reserve are closed to private traffic overnight under a 2009 ban the Supreme Court upheld in 2019. Reports give the start as 9 pm or 8.30 pm; be through by 8.30.

    Is South India easier riding than Ladakh?

    Different, not easier. No altitude and sealed road throughout, but far more traffic per kilometre, hairpins shared with buses, and humidity that stops your body cooling. Kerala has the third-most crashes in India and the seventeenth-most deaths; most of what goes wrong here goes wrong at town speed.

    Sources

    • Press Information Bureau, "Ease of Living: Bharatmala, Optimizing the Efficiency of Movement", November 2022: 32 km/h average speed on the national highway network and the 25 per cent target. Link
    • Kerala Motor Vehicles Department, "Speed Limits in Kerala" (G.O.(P) No. 20/2014/Tran, 28 February 2014), read 16 October 2026: motorcycle limits of 60 on national highways, 50 on state highways, 45 on ghat roads, 50 in municipal limits. Link
    • Onmanorama, "Road speed limits revised in Kerala after 9 years; two-wheelers must go slower", 14 June 2023: the two-wheeler ceiling cut from 70 to 60 km/h from 1 July 2023. Link
    • Ministry of Road Transport and Highways, "Details of National Highways as on 31.03.2019": NH 66 at 1,640.66 km, Panvel to near Kanyakumari, with 677.77 km in Kerala and 294.14 km in Karnataka. Link
    • Kerala Kaumudi, "Kasargod-Thiruvananthapuram @643 km; construction of NH66 will be completed by end of next year", 9 July 2024: the 643 km, 45 m, 17-reach project. Link
    • Onmanorama, "NH 66 nearing completion in Kerala, inauguration by January 2026", 9 October 2025: 450 km complete and the January 2026 inauguration target. Link
    • Kerala Kaumudi, "Construction of NH 66 will be completed by March; will be inaugurated before Model Code of Conduct comes into force", 19 December 2025: the Union minister's March target in the Lok Sabha and the collapse at three locations in six months. Link
    • Kerala Kaumudi, "NH 66 Kerala: Dream project getting delayed, unlikely to be completed this year", 24 April 2026: collapses at Kooriyad and Mylakkadu and the alignment change. Link
    • Onmanorama, "National Highway 66 progress lags in Kerala, NHAI brings in AI to monitor work", 6 October 2026: the Kannur reach extended to April 2028, and reach completion at 91, 87 and 68 per cent. Link
    • Daijiworld, "NH 66 expansion: Grade separators planned for renewal in Udupi district", 26 September 2026: Talapady to Mulki four-laned and Kundapur to Byndoor being widened to 60 m, quoting NHAI Mangaluru. Link
    • Kerala State Planning Board, Economic Review 2025, Volume 1, Chapter 11 "Infrastructure", Transport, January 2026: 182 lakh registered vehicles and 118.67 lakh two-wheelers as of March 2025. Link
    • Tamil Nadu Transport Department, "Policy Note 2024-25, Demand No. 48": 3.59 crore vehicles with 84.09 per cent two-wheelers as of 1 May 2024, and 30,881 stage carriage buses of which 20,260 are state-owned. Link
    • Ministry of Road Transport and Highways, "Basic Road Statistics of India 2019-20" (archived copy): road density of 6,650.24 km per 1,000 sq km for Kerala and 1,934.62 for India. Link
    • Kerala Tourism, "Thamarassery Churam", read 16 October 2026: nine hairpin bends over the 14 km from Adivaram to Lakkidi viewpoint at 800 m. Link
    • Onmanorama, "Daytime ban on multi-axle trucks introduced on Thamarassery ghat road", 3 June 2026: the Kozhikode collector's 6 am to 8 pm ban on NH 766 and the Kuttiadi and Nadukani alternatives. Link
    • Madras High Court, W.P. Nos. 1830, 4130 and 4109 of 2022, judgment of 6 April 2022 (copy hosted by LiveLaw): the 9 km Dhimbam ghat with 27 hairpins, two-wheelers permitted 6 am to 9 pm only, the 20 km/h truck limit on the ghat and the ban on vehicles of 12 wheels and above. Link
    • Tamil Nadu Tourism, "Kalhatti Waterfalls", read 16 October 2026: the Sigur Ghat road and its 36 hairpin bends. Link
    • Onmanorama, "Masinagudi travel restrictions", 26 September 2026: the High Court order on the Kalhatty ghat road, the 200-vehicle daily quota usually exhausted by 11 am, and the Mavanahalla checkpoint. Link
    • The Week (PTI), "Bandipur night traffic ban", 7 April 2025: the 2009 ban restricting movement from 9 pm to 6 am, upheld by the Supreme Court in 2019. Link
    • Onmanorama, "Wayanad-Bandipur mega tunnel road", 30 January 2026: vehicular movement prohibited between 8.30 pm and 6 am on NH 766 and NH 67. Link
    • India Meteorological Department via WMO and NOAA NCEI, "WMO Climatological Standard Normals 1991-2020, India, Mangalore Bajpe Airport (43284)", version dated 22 January 2025: monthly mean relative humidity, daily maximum temperature and rainy days. Link
    • India Meteorological Department, "FAQ on Heat Wave", read 16 October 2026: high relative humidity slowing sweat evaporation and reducing the body's cooling efficiency, and the hot and humid weather definition. Link
    • NIOSH (US CDC), "Criteria for a Recommended Standard: Occupational Exposure to Heat and Hot Environments", Publication 2016-106, February 2016: evaporative heat loss virtually nonexistent when the heat index exceeds 35 degrees C largely due to humidity. Link
    • India Meteorological Department, Regional Meteorological Centre Chennai, "Report on Northeast Monsoon 2025", April 2026: the normal onset of the north-east monsoon over coastal Tamil Nadu on 20 October. Link
    • India Meteorological Department, press release of 15 October 2026: south-west monsoon withdrawn from the entire country and north-east monsoon rainfall commenced over Tamil Nadu and Kerala the same day. Link
    • Ministry of Road Transport and Highways, "Road Accidents in India 2023", released 28 August 2025 (copy hosted by OpenCity): national totals, the 44.8 per cent two-wheeler share, the state tables and Kerala's 2,233 two-wheeler deaths. Link
    • Ministry of Road Transport and Highways, "Road Accidents in India 2024", 2026 (copy hosted by OpenCity): 4,87,707 crashes, the 46.2 per cent two-wheeler share and the Tamil Nadu and Kerala state rows. Link

    Col. Shekhar Attri, SM (Retd.)

    @adv_pathfinder

    Founder and expedition commander of ADV Pathfinder. 20+ years in the Indian Army's Para Special Forces, Sena Medal. About the founder

    Go deeper

    Ride it with us

    Have a question about this?

    Ask us directly - no account needed, and we answer with facts about your dates.

    More dispatches